Site Inspection

» 

Technical documentation

Complete book in PDF
» Feedback
Content starts here

 » Table of Contents

 » Index

Table C-4 Customer and Hewlett-Packard Information

Customer Information
Name:Phone No:
Street Address:City
or
Town:
State or Province:Country
Zip or postal code: 
Primary customer contact:Phone No.:
Secondary customer contact:Phone No.:
Traffic coordinator:Phone No.:
Hewlett-Packard information
Sales representativeOrder No:
Representative making surveyDate:
Scheduled delivery date 

 

Table C-5 Site Inspection Checklist

Please check either Yes or No. If No, include comment# or dateComment or Date
Computer room
No.Area or conditionYesNo

1.Is there a completed floor plan?  

2.Is there adequate space for maintenance needs?
Front 36 in (91.4 cm) minimum, Rear 36 in (91.4 cm) minimum are recommended clearances.
  

3.Is access to the site or computer room restricted?  

4.Is the computer room structurally complete?
Expected date of completion?
  

5.Is a raised floor installed and in good condition?  

6.

Is the raised floor adequate for equipment loading?

7.Are there channels or cutouts for cable routing?  

8.Is there a remote console telephone line available with an RJ11 jack?  

9.Is a telephone line available?  

10.Are customer supplied peripheral cables and LAN cables available and of the proper type?  

11.

Are floor tiles in good condition and properly braced?

12.

Is floor tile underside shiny or painted? If painted, judge the need for particulate test.

Power and lighting
No.Area or conditionYesNo

13.Are lighting levels adequate for maintenance?  

14.Are there AC outlets available for servicing needs? (i.e. vacuuming)  

15.Does the input voltage correspond to equipment specifications?  

15A

Is dual source power used? If so, identify type(s) and evaluate grounding.

16Does the input frequency correspond to equipment specifications?  

17.Are lightning arrestors installed inside the building?  

18.Is power conditioning equipment installed?  

19.Is there a dedicated branch circuit for equipment?  

20.Is the dedicated branch circuit less than 250 feet (72.5 meters)?  

21.Are the input circuit breakers adequate for equipment loads?  

Safety
No.Area or conditionYesNo

22.Is there an emergency power shut-off switch?  

23.Is there a telephone available for emergency purposes?  

24.Is there a fire protection system in the computer room?  

25.Is antistatic flooring installed?  

26.Are there any equipment servicing hazards
(loose ground wires, poor lighting, etc.)?
  

Cooling
No.Area or conditionYesNo

27.Can cooling be maintained between 20 °C and 55 °C (up to 5000 ft.)? Derate 1 °C/1000 ft. above 5000 ft. and up to 10,000 ft.  

28.Can temperature changes be held to 10 °C per hour with tape media? Can temperature changes be held to 20 °C per hour without tape media?  

29.Can humidity level be maintained at 40% to 60% at 35 °C noncondensing?  

30.Are air conditioning filters installed and clean?  

Storage
No.Area or conditionYesNo

31.Are cabinets available for tape and disc media?  

32.Is shelving available for documentation?  

Training

No.

Area or Condition  

33

Are personnel enrolled in the System Administrator's Course?  

34

Is on-site training required?  

 